No. |
WJO Department |
WJO Division |
Description of Services or Materials |
Type of Tender / Award Basis |
Year |
1 |
Fields Development Group Admin. |
Workovers Team |
The service comprises the provision of slickline, material, personal, tools, equipment and other miscellaneous associated service. proposed |
Back-to Back to KOC Contract |
2024 |
2 |
Supply Chain Dept. Admin. |
General Services Division |
Provision of Pest Control & Landscaping Services |
Service Contract (SC) -Tender |
2024 |
3 |
Fields Development Group Admin. |
Workovers Team |
Provision of Mud Products and Mud Engineering Services |
Back-to Back to KOC Contract |
2024 |
4 |
Fields Development Group Admin. |
SUG,SF Expln. Assets Management Team |
Provision of Slickline and Associated Services |
Back-to Back to KOC Contract |
2024 |
5 |
Fields Development Group Admin. |
SUG,SF Expln. Assets Management Team |
Provision of Logging and Perforation Services (USD) |
Back-to Back to KOC Contract |
2024 |
6 |
Fields Development Group Admin. |
SUG,SF Expln. Assets Management Team |
Provision of Logging and Perforation Services (USD) |
Back-to Back to KOC Contract |
2024 |
7 |
Supply Chain Dept. Admin. |
General Services Division |
Hire of Light Vehicles |
Service Contract (SC) -Tender |
2024 |
8 |
Terminal / Oil Export Group |
Terminal / Oil Export Group |
The scope of services includes provision of brand-new Marine crafts and diving equipment for company terminal operation, maintenance of terminal and oil spill response at Al-Zour (Mina Saud) or in its vicinity. |
Service Contract (SC) -Tender |
2024 |
9 |
Fields Development Group Admin. |
SUG,SF Expln. Assets Management Team |
Provision of Logging and Perforation Services (USD) |
Back-to Back to KOC Contract |
2024 |
10 |
Large Scale Pilot Project Dept. Admin. |
Large Scale Pilot Project Dept. Admin. |
Supply Operations & Maintenance personnel, OEM services, and supply specialized materials and equipment to support LSP Plant Operations |
Service Contract (SC) -Tender |
2024 |
11 |
Fields Development Group Admin. |
Workovers Team |
The service comprises the provision of Supply CTU, pumping, Nitrogen lifting & Associated service. B2B agreement proposed contract value is in USD. |
Back-to Back to KOC Contract |
2024 |
12 |
Terminal / Oil Export Group |
Terminal / Oil Export Group |
MGC to Terminal Pipeline patrolling services and terminal maintenance services (Mechanical, Electrical, Instrumentation and HVAC) for Terminal onshore and offshore facilities excluding tank maintenance, and maintenance services for subsea pipeline and structures. |
Service Contract (SC) -Tender |
2024 |
13 |
Fields Development Group Admin. |
SUG,SF Expln. Assets Management Team |
Fluid level & dynamometer survey services for jo wells (KWD) |
Service Contract (SC) -Tender |
2024 |
14 |
Supply Chain Dept. Admin. |
General Services Division |
Provision of Community and Catering Services |
Service Contract (SC) -Tender |
2024 |
15 |
Support Services Dept. Admin. |
Personnel Administration Team |
Supply of Manpower |
Service Contract (SC) -Tender |
2024 |
16 |
Supply Chain Dept. Admin. |
General Services Division |
Provision of Cleaning & Associated Services |
Service Contract (SC) -Tender |
2024 |
17 |
Supply Chain Dept. Admin. |
General Services Division |
Provision of Civil Maintenance Services |
Service Contract (SC) -Tender |
2024 |
18 |
Reliability Improvement Group Admin. |
Mechanical Maintenance Division |
Provide personnel, vehicle, tools and equipment on monthly hire basis in order to carry out Preventative, Predictive and Breakdown Maintenance Services of all types of surface Rotating Equipment such as Pumps, Compressors, Gensets etc. Provide, install and operate machinery at the Company's machine shop building to provide Machine Shop Services; Carryout Radiator/ Cooler/Exchangers Repair/ Engine Overhauling and Repair Services and Overhead Crane maintenance & certification as and when directed by the Company Representative. |
Service Contract (SC) -Tender |
2024 |
19 |
Supply Chain Dept. Admin. |
General Services Division |
Provision of Sanitation & Waste Management Services |
Service Contract (SC) -Tender |
2024 |
20 |
Supply Chain Dept. Admin. |
General Services Division |
Provision of Sanitation & Waste Management Services |
Service Contract (SC) -Tender |
2024 |
21 |
Reliability Improvement Group Admin. |
Mechanical Maintenance Division |
1.Part A-Welding Services: Providing all specified services required for the maintenance of pipelines, equipment etc. by supplying required Manpower, Vehicles, Equipment, Tools and other resources on monthly hire basis as specified in detail in the contract. 2. Part B- Maintenance of Tanks & Vessels: Provide all types of mechanical maintenance of static equipment such as Tanks, Vessels, connected piping, Flares, refractory breaking work etc. Also provide industrial painting for all pipings, Scaffolding & equipment as more explained in the contract. |
Service Contract (SC) -Tender |
2024 |
22 |
Support Services Dept. Admin. |
Information Technology Division |
The Contractor shall supply (lease basis) and maintain IT Hardware Equipment including PC, Laptop, Audio Visual (projectors), Printers, Scanner and accessories. |
Service Contract (SC) -Tender |
2024 |
23 |
Environment, Health, Safety, Fire & Security Group Admin. |
Asset Integrity Division |
Bulk Supply Of Chemical for Corrosion and scale control services of crude and water treatment |
Service Contract (SC) -Tender |
2024 |
24 |
Reliability Improvement Group Admin. |
Mechanical Maintenance Division |
Hire of Core equipment along with required manpower on monthly unit rate basis. Hire of national & non-national manpower for Company services on monthly unit rate basis. Engine overhauling services for company owned heavy equipment on unit rate price basis, Supply of spare parts and any additional work as required. Hire of non-core equipment as and when required on daily rate basis. |
Service Contract (SC) -Tender |
2024 |
25 |
Environment, Health, Safety, Fire & Security Group Admin. |
Asset Integrity Division |
Bulk Supply of Chemicals and Chemicals Treatment Services for Crude Oil |
Service Contract (SC) -Tender |
2024 |
26 |
Support Services Dept. Admin. |
Information Technology Division |
The lease contract is to provide & connect Voice & Data Services to Rigs of the Company, through VSAT Satellite Network. The lease for VSAT Network includes all the require Hardware, Software, Satellite link bandwidth Subscription Services, Auto Tracking antennae & Network Management System (NMS). |
Service Contract (SC) -Tender |
2024 |
27 |
Supply Chain Dept. Admin. |
General Services Division |
Supply of Stationeries |
Service Contract (SC) -Tender |
2024 |
28 |
Fields Development Group Admin. |
SUG,SF Expln. Assets Management Team |
Supply, Installation and Maintenance of Surface and Down Hole ESP Equipment for JO Wells (KD) |
Service Contract (SC) -Tender |
2024 |
29 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(MGC Eocene Upgrade) Upgrade MGC Eocene Plant including, new Tanks, Desalters, Towers Heaters, Pumps, and fin-fan coolers. Contractor scope of work is Engineering, Procurement, construction, commissioning and performance as Lump-sum contract. |
Construction (HC) - Tender |
2024 |
30 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(MGC Utilities Upgrade) Upgrade MGC Utilities including, new instrument air compressor systems, new briskish water system, New satellite Instrument House, new fire and gas detection system, new public address system, and upgrade cathodic protection system Contractor scope of work is Engineering, Procurement, construction, commissioning and performance as Lump-sum contract. |
Construction (HC) - Tender |
2024 |
31 |
Large Scale Pilot Project Dept. Admin. |
LSP Technical support Division |
2nd Eocene EOR (Polymer) Multi-Well Test. Design, Build, Install and Operate Polymer Mixing and Injection Facilities. Supply polymer chemical for EOR purposes. |
Service Contract (SC) -Tender |
2024 |
32 |
Projects and Facilities Engineering Group Admin. |
Facility Engineering Team |
(PMP Disposal System Upgrade) Design, procurement, construction, installation, pre-commissioning and commissioning of new surge tanks, disposal pumps, flare and PCR in PMP. |
Construction (HC) - Tender |
2024 |
33 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(MGC Ratawi Upgrade) Upgrade MGC Ratawi Plant including new Tanks, Desalters, Towers Heaters, and fin-fan coolers Contractor scope of work is Engineering, Procurement, construction, commissioning and performance as Lump-sum contract. |
Construction (HC) - Tender |
2024 |
34 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(Hottpad Expansion Project) to build and operate Hottpad Plant including 10 Base Systems along with treatment and emission facilities. |
Service Contract (SC) -Tender |
2024 |
35 |
Terminal / Oil Export Group |
Terminal / Oil Export Group |
The scope of services includes provision of brand-new Marine crafts and diving equipment for company terminal operation, maintenance of terminal and oil spill response at Al-Zour (Mina Saud) or in its vicinity. |
Service Contract (SC) -Tender |
2024 |
36 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(Subsea Pipeline Replacement (SPR)) The WJO 36” Offshore CBM-SPM Pipeline Project objective is to address the significant internal corrosion on the pipeline to resume safe and reliable offtake loading operations at the SPM. The project will minimize the risks and duration for costly interim loading operations at the intermediate CBM. The 3.6 km segment was determined to have significant internal corrosion resulting from a smart pig run conducted in Q2-2019. The pipeline inspection was performed by Rosen with an MFL tool and detected 3639 metal loss features between the CBM & SPM. In addition, a 900m section of the pipeline passes through Mina Al-Zour residential area, and the team will evaluate reroute options to evacuate the residential area from WJO facilities via FEED. |
Construction (HC) - Tender |
2024 |
37 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(SC-39 & SC-25 Trunk Line Upgrade Project) Upgrade production by installing two new trunk lines from SC-39 to SC-25 and SC-25 to SC-20. Contractor scope of work is Procurement, Construction, Commissioning, and performance. |
Construction (HC) - Tender |
2024 |
38 |
Terminal / Oil Export Group |
Terminal / Oil Export Group |
Terminal tank maintenance services comprises all types of maintenance, repair, replacement, de-sludging, cleaning, crude recovery, testing, painting and all other works for the above ground floating roof type crude oil and fixed roof type diesel storage tanks along with associated piping at the Company operation areas, and shall include provision of materials, inspection, quality control, all supervision, skilled and non-skilled personnel, plant and equipment, coordination and all other work which are necessary to complete specific work covered in the Contract. |
Service Contract (SC) -Tender |
2024 |
39 |
Support Services Dept. Admin. |
Information Technology Division |
Provide WJO IT with high level support and consultation. |
Service Contract (SC) -Tender |
2024 |
40 |
Terminal / Oil Export Group |
Terminal / Oil Export Group |
Marine Weather Forecasting Services (low value contract) |
Single Source Contract |
2024 |
41 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(Wafra Flare Systems and Gas Facilities Upgrade Project) Upgrade Ratawi SCs flare packages including 1) (4 Nos.) Flare Package for SCs 14, 16/21, 23/20 and 24 complete with all appurtenances, instruments and controls. 2) (2 Nos.) Gas Scrubbers at SCs 22 and 24 complete with all appurtenances, instruments and controls. 3) Flow meters for all new HP flare stack headers at Ratawi SC Flares 14, 16/21, 20/23 and 24. 4) (5 Nos.) Fuel Gas Knockout Drums at SCs 14, 16, 21, 23 and 24 complete with all appurtenances, instruments and controls. 5) Purge systems for all new HP flare stacks at Ratawi SCs 14, 16, 21, 23 and 24, and existing LP and HP flare stacks at Eocene SCs 1, 3, 5, 11, 13, 18 and 19. Contractor Scope of Work is Procurement, Construction, Commissioning, and performance. |
Construction (HC) - Tender |
2024 |
42 |
Projects and Facilities Engineering Group Admin. |
Facility Engineering Team |
(Central Warehouse Project) Build a new Central warehouse that meet WJO requirements. The building has Fire protection system (detection, alarm, sprinklers, hose reels, tanks, pumps etc), also CCTV access control system and Fully air conditioned, design & construction specifications meet all WJO EHS,KEPA requirement. |
Construction (HC) - Tender |
2024 |
43 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(Main Gas Scrubber Upgrade Project) Upgrade the MGS area including replacements of corroded gas pipework at GHU aea with new inlet and outlet manifolds, insallation of Flare System, fire and gas detection system, security fencing and lighting, PLC and PCR, closed drain system with drain pump. Contractor scope of work is Procurment, Construction, Commissioining, and performance. |
Construction (HC) - Tender |
2024 |
44 |
Projects and Facilities Engineering Group Admin. |
Facility Engineering Team |
(New Chemical Injection Facilities at Ratawi & Eocene Sub-Centers) Construction, Installation, Pre-commissioning and Commissioning of Chemical Injection Facilities at 24 SC`s |
Construction (HC) - Tender |
2024 |
45 |
Projects and Facilities Engineering Group Admin. |
Facility Engineering Team |
(Fire Protection System at SUG) Design, procure, construction, installation, pre- commissioning and commissioning of Fire Protection System at SUG |
Construction (HC) - Tender |
2024 |
46 |
Projects and Facilities Engineering Group Admin. |
Facility Engineering Team |
(Storage Tanks for SC-13 & SC-18, SC Reliability & Operability Upgrade) Design, procurement, construction, installation, pre-commissioning and commissioning of new storage tanks for SC-13 & SC-18. |
Construction (HC) - Tender |
2024 |
47 |
Projects and Facilities Engineering Group Admin. |
Facility Engineering Team |
(FE-141: Sub - Center Chemical Injection Facilities Upgrade Project) Construction, Installation, Pre-commissioning and Commissioning of Chemical Injection Facilities at 11 SC`s |
Construction (HC) - Tender |
2024 |
48 |
Reliability Improvement Group Admin. |
Mechanical Maintenance Division |
Maintenance of PMP Byron Jackson High pressure injection pumps at OEM facilities include with transportation and commissioning of pumps after maintenance. |
Service Contract (SC) -Tender |
2024 |
49 |
Projects and Facilities Engineering Group Admin. |
Facility Engineering Team |
(FET Engineering Support Services) Providing engineering services for FET such as developing ESRs, FEED, detailed design and supply resources whenever required. |
Service Contract (SC) -Tender |
2024 |
50 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(Construction of A New Access Control & Security Building) Construction of a New Access Control & Security Office Building at JO-Wafra, consisting of 2 Storeys with reinforced concrete structure including central HVAC system, installation and connection of all necessary services |
Construction (HC) - Tender |
2024 |
51 |
Projects and Facilities Engineering Group Admin. |
Facility Engineering Team |
(Heavy Oil MGC Expansion & S/C Facilities Upgrade: S/C-01 Crude Storage Facilities Upgrade (POD)) Design, procurement, construction, installation, pre-commissioning and commissioning of new storage facilities for SC-01 |
Construction (HC) - Tender |
2024 |
52 |
Projects and Facilities Engineering Group Admin. |
Facility Engineering Team |
(PMP Replacement of Chemical Injection Facilities) Construction, Installation, Pre-commissioning and Commissioning of Chemical Injection Facilities at PMP |
Construction (HC) - Tender |
2024 |
53 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(Upgrade of Security System For WJO) The scope involves supply & Installation of Control Room Wall Display with Control room ergonomic consoles. The scope involves replacement of Existing Physical Security System. Upgrade of Access Control System. |
Construction (HC) - Tender |
2024 |
54 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(Heavy Equipment Garage Extension & Construction of New Dispatcher Office) This project consists of the following: -Construction of an Extension to the existing Garage Facilities (steel structure building). -Construction of a new Dispatcher Office with pantry and toilet facilities (concrete and masonry building with steel structure roof). |
Construction (HC) - Tender |
2024 |
55 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(Upgrade of Security System For JO-Terminal) Installation of new IP CCTV with recording servers & storage to meet the requirement as per MOI. Replacement of Physical security system. To install RADAR to meet the ISPS compliance. |
Construction (HC) - Tender |
2024 |
56 |
Projects and Facilities Engineering Group Admin. |
Construction Division |
(WJO FIELD EXCAVATION SERVICES) Provide field excavation services to various WJO departments. |
Service Contract (SC) -Tender |
2024 |
57 |
Reliability Improvement Group Admin. |
Electrical Maintenance Team |
Upgrade / Replacement WJO Mina Al-Zour Terminal Facility Process Control Network Systems Which Is Critical Component to WJO Terminal Operations Enabling Digital Transformation For IP-PCN Compliance Requirements |
Construction (HC) - Tender |
2024 |
58 |
Reliability Improvement Group Admin. |
Electrical Maintenance Team |
Provide Maintenance and Engineering Support Services Contract for Yokogawa Process Control Systems & Network Security Systems At Pod (SC-1,3,5,10,11,13,14.16,18,19,20,21,22,23,24,34, SUG, GHU & WCC). |
Single Source Contract |
2024 |
59 |
Reliability Improvement Group Admin. |
Electrical Maintenance Team |
Upgrade/ Replace of LSP PCN Systems, LSP PCN System Is a Critical Component To LSP Operation. To Upgrade / Replace The 27 Nos Of Obsolete Allen-Bradley Plc’s And Upgrade The Wonderware Scada System With Newer Version. And Compliance to Company Cybersecurity Policy. |
Construction (HC) - Tender |
2024 |
60 |
Projects and Facilities Engineering Group Admin. |
Major Projects Division |
(Terminal Marine Jetty and Boat Ramp Refurbishment) Marine jetty and Boat Ramp structures are located at the Al-Zour Terminal serves as the access point to offshore facilities of Wafra Joint Operations for mobilizing crew & equipment from/to boats, tugs and barge for carrying out routine berthing/deberthing operations and for maintenance work. The Jetty Head also houses the main firewater pumps and Jockey pumps. Currently, the condition of the Jetty and Boat Ramp, which includes load bearing steel structures (piles and cross beams) and the boat landing area are heavily corroded and damaged due to boat impact and poses concerns to the integrity of the Jetty structure, potential risk of damage to the structure and collapse causing serious/fatal injury to personnel during personnel transfer from Jetty to the boats. Scope of project: The planned refurbishment project will involve restoring the original design capacity & functionality of the jetty and boat ramp structure. |
Construction (HC) - Tender |
2024 |
61 |
Reliability Improvement Group Admin. |
Electrical Maintenance Team |
SUPPORT SERVICES CONTRACT FOR EMERSON DELTA V ICSS, INTEGRATED PLC AND CYBER SECURITY AT MGC PCN SYSTEMS (PCR1,2,5,8,11&12). |
Single Source Contract |
2024 |
62 |
Reliability Improvement Group Admin. |
Electrical Maintenance Team |
Provide Comprehensive Maintenance of Faure Herman Metering & Control System Facilities at Main Gathering Center of The Company For Eocene and Ratawi Act Units. The Contractor Shall Arrange Annual Calibration of The Prover Loops as Per Approved Schedule By Authorized, Approved And Certified Inspection Agency. The Contractor Shall Supply Flow Specialist to Visit Company for The Quarterly Calibration And Preventive Maintenance And Prover Loop Calibration. |
Single Source Contract |
2024 |